Cobra Aviation Operation Site Wiener Neustadt, AT New construction of a deployment site
New construction of an aviation operation site
A new aviation operation site was built in Wiener Neustadt for the Cobra, featuring 450 m² of mullion-and-transom façade and specialized glass with integrated blinds.
450 m²
mullion-and-transom façade
70 pcs.
highly thermally insulated aluminum tilt windows
19 pcs.
highly thermally insulated aluminum swing doors